Project Progress Jan 6 2007

We cranked away at the floor joists of the second floor and were able to lay down about 3/4 of the floor sheeting. Greg reminded me that layout was all important when he had to rip out about a dozen pieces of blocking that I had put in that didn’t hold the joists to spacing of 14.5″. Mark and I also started the sheeting in the wrong direction, so Pop, Mark and I got back up there at 8:30p and ripped up the 3 sheets we had already laid down so that the glue could be scraped off before drying. The floor looks huge without any walls to break it up.

Sweeping up

Sweeping up

Are we putting in a dance floor?

Are we putting in a dance floor?

More flooring

More flooring

Taking a break, but just a small one

Taking a break, but just a small one