On 8 December 2005, Toby picked up our ‘wet stamped’ set of plans from the City of Carpinteria along with our inspection sign off sheet.
We have permits.
Our first weekend of work was finishing up the 3 foot high block wall in the front
yard that will be a raised planter to hold the dirt that is excavated from the footings
we will dig. Below is a picture of the finished wall.